Bid Summaries - 2019

CONSTRUCTION

  1. 2018 Safe Routes to School - Bookcliff Middle School IFB-4655-19-DH (PDF)
  2. 2019 7th Street Reconstruction - Orchard Ave. to Patterson Ave. IFB-4627-19-DH (PDF)
  3. 2019 Curb, Gutter and Sidewalk Replacement Project IFB-4693-19-DH (PDF)
  4. 2019 Fire Training - Building Foundation IFB-4690-19-DH (PDF)
  5. 2019 Fire Training Facility - Burn Slab IFB-4707-19-DH (PDF)
  6. 2019 Monument Road Bicycle Path Trail IFB-4618-19-DH (PDF)
  7. 2019 Sewer Interceptor Repair and Replacements IFB-4602-19-DH (PDF)
  8. 2019 Sewer Line - Asphalt Patches IFB-4654-19-DH (PDF)
  9. 2019 Sewer Line Replacement Project - Phase B IFB-4675-19-DH (PDF)
  10. 2019 South Downtown Water and Sanitary Sewer Replacement Project IFB-4628-19-DH (PDF)
  11. Bid Tabulation IFB-4622-19-DH2019 Contract Street Maintenance - Asphalt Overlays IFB-4622-19-DH (PDF)
  12. Chipseal Thermoplastic Pavement Markings IFB-4663-19-DH (PDF)
  13. Grand Junction Regional Communications Center Remodel IFB-4657-19-DH (PDF)
  14. Las Colonias Business Park Restrooms IFB-4637-19-DH (PDF)
  15. Las Colonias Park - River Recreation Feature IFB-4648-19-DH (PDF)
  16. Persigo Wastewater Treatment Plant Control Structure #3 Slide Gate Replacement Project IFB-4722-19-DH (PDF)
  17. Pipe Supply for City Streets Division IFB-4720-19-DH (PDF)
  18. Raw Water Irrigation Supply and Waterline Replacement IFB-4611-19-DH (PDF)
  19. Riverside Park Improvements and Bike Path IFB-4621-19-DH (PDF)
  20. Riverside Park Shelter IFB-4664-19-DH (PDF)
  21. Safe Route to Schools IFB-4609-19-DH (PDF)
  22. The Riverfront at Dos Rios Business Park Phase 1 IFB-4616-19-DH (PDF)
  23. Tiara Rado and Facilities Office Re-Roof Project 2019 IFB-4695-19-DH (PDF)
  24. Tiara Rado Clubhouse Gas Detection and Ventilation Systems Replacement IFB-4709-19-DH (PDF)
  25. Vault Toilets for Parks Operations Locations IFB-4614-19-DH (PDF)