View a map of the 2021 Street Infrastructure Program (PDF). The streets selected for the 2021 Contract Street Maintenance Asphalt Overlays project are:
- Crossroads Boulevard
- 20 1/2 Road in the Redlands
- 27 Road south of Highway 50 on Orchard Mesa
- 27 Road from Horizon Drive to I-70
- H Road from 26 Road to 26 1/2 Road